Sök:

Sökresultat:

239 Uppsatser om Prefabricated walls - Sida 1 av 16

Tid- och kostnadsanalys av innerväggar

In our thesis we will compare interior walls, both bearing and non-bearing. All of thewalls analyzed are currently used in production by Skanska Construction, who is alsoour employer/supervisor for the project. The different wall types will be comparedfocusing mainly on time, cost and workability. All of these walls aside from the nonbearingwall are constructed using concrete, either prefabricated or cast on site..

UTFACKNINGSVÄGGAR : En jämförelse mellan platsbyggda och prefabriceradebyggmetoder

In conjunction with today?s increasing competition within the construction sector, more pressure is being placed on building contractors. Efficiency and improvements are necessary but without impairment to an ergonomic and safe construction site. This in is in order to reduce the construction costs and time but to retain the ability to deliver a high-quality contract.Various methods and prefabrication degrees are used, depending on the project's requirements and conditions. This analysis sets out to investigate and exhibit what qualifications are important when choosing a construction method for curtain walls.Advantages and disadvantages with each method have been analyzed and recommendations have been given to show when different methods are best suited.

Studentbostäder i trä med Prefab-teknik

The Results of this thesis was the creation of two designed house variants with a module toall the apartments. In addition till the first module there are three other modules ofapartments that can be put in the houses if it so needs. The house are volume prefabricatedand are placed on site in a way that it create an enclosure of the area which faces against thenature and car parks also lies hidden behind these houses.For the actual structure, a cross beam was created to carry the floor above and it is supportby all four walls. The structure between the first and the second floor has no "syll" butinstead there are two differently alternative to linking the floors in order so that it will notmove. The reason with this solution was that there will not be any subsidence when theforces from above are pressed down ward.

Prefabricerade passivhusväggar

Background: The most energy efficient houses today are so called passive houses. These houses achieve high energy-efficiency partly by having well insulated walls. U-value describes the amount of heat transfered through a building element, the more insulation, the smaller U-value. A typical passive house wall have a U-value of 0.10 W/m2,°C. The passive houses are primarily made as small family houses and not as a block of apartments.

Prefabricerade stödmurar i betong :

This is a booklet with information and inspiration about precast retaining walls. The three chapters contain information about concrete as a material, how the surface of the wall can be altered, and a chapter with ideas for a new precast wall. I have obtained information through books, interviews, lectures and fairs. The retaining walls on the market do not correspond to the requirements of the Landscape Architects I have interviewed. I have therefore considered their opinions in the chapter containing my new ideas for new retaining walls.

F?r all sten i Sm?land: Inventeringsunderlag f?r kulturhistorisk v?rdering av stenmurar

This thesis focuses on the construction of drystone walls in the county of Sm?land, as well as their historical value and significance to the county. In Riksantikvarie?mbetets Plattform Kulturhistorisk v?rdering och urval, a directory for historical evaluations of buildings and objects, the first clause is to describe the object and its history. When trying to do this, the lack of literature focusing on the constructional elements of drystone walls and their history became an issue and is what prompted the writing of this thesis. With a study of different handbooks, a compilation of the constructional elements of the walls were put together.

VIBRATIONSSKADOR - FÖREKOMST OCH FÖREBYGGANDE : Analys av ett strukturerat arbetssätt inom bostadsproduktion

Ask any constructional worker and there is a high probability that this person knows a colleague with pain or other disorders caused by working with power tools.According to the Swedish Work Environment Authority 71 percent of the Swedish constructional workers is exposed to vibrations at least 25 percent of the working hours. Despite this, the number of reported occupational sicknesses caused by vibrations is as low as 1, 4 percent.JM Ltd. is one of the largest constructional companies in Sweden. Their main business is new housing and development of residential areas. God quality and low impact on the environment is a part of great importance in the company?s long-term goals.

"En mycket boksynt man" Karl-Gunnar Walls liv som stadsbibliotekarie och litteraturvän

The purpose of this master thesis is to describe the professional and literary life of Karl-Gunnar Wall, city librarian of Katrineholm between 1944 and 1975. Questions at issue are the reasons for Walls literary interests, Walls choice of occupation, crucial personal meetings, the context in which Wall acts, Walls fundamental principles as a librarian and as a critic, and the features comprising Walls life history. The method used is a merely qualitative one called "life history". It is founded on in-depth interviews with the persons involved and emanates from the individuals own story about his life. I have carried out three taped interviews; one with Wall himself, and two with his colleagues.

Passivhus med prefabelement : En jämförelse mellan en platstillverkad konstruktion och prefabelement från Masonite Lättelement AB

This thesis conducted at the University of Uppsala investigateshow well a prefabricated building component from the manufacturerMasonite Lättelement AB can be incorporated into ahouse projected to accomplish the demanding criteria of a passivehouse. The thesis is organized as a comparison betweenthe prefabricated elements and an on-site built component fromthe passive house area of Oxtorget in Värnamo, Sweden. Theaspects investigated were air leakage, energy, moisture, economyand noise conditions.Results of the comparative analyzes shows that the prefabricatedproducts were capable of accomplishing the requirementsof passive houses and therefore this thesis should beviewed as a basis to confirm that the technology of prefabricatedbuilding components today in Sweden are mature enoughto be a significant part of the passive houses that are to be builtin the near future. The development of prefabricated technologyis of crucial significance if we are to accomplish the goalsof reduced energy consumption by the year 2020..

Prefabricerat trähusbyggande med moduler : För- och nackdelar samt förslag på vidareutveckling

The construction industry can contribute to a healthier sustainable community. A development that is going on right now is by using more prefabricated volume- and plan elements on the construction sites. Building with this method not only provides a benefit to the environment, but also reduces production rates by taking up to 80 percent less time to build. By building in this way it will be easier to recycle and keep all the material that otherwise would go to waste. Also by building inside a protected environment, the material retains its good quality.This report will take forward proposals on further development of prefabricated volume element of wood, by first presenting this construction methods advantages and disadvantages..

Ljudisolering - Teknisk felsökning och kvalitetssäkring av lätta bygg-system

By using industrialized building, pre-installed modules can be delivered to the construction site where they are easily mounted. This method has many advantages compared to on-site manufacturing, for example, the precision during the production process should be much higher than building each wall and floor on site. Furthermore, the quick erection procedure when using prefabricated elements and the possibility to use weather protection has the advantage of not being dependent on weather conditions, and many other factors.Masonite Beams AB is a Swedish company (a member of the Norwegian company, Byggma ASA) with a relatively new technology using light weight beams as bearing elements in the walls and a certain stiff board lamella slap which is mounted on the top of the floor structure creating an integrated stiff beam / board floor structure. The elements are flat which make it much easier to transport the elements from the factory to the building site where the building parts are easily mounted with special mounting stud.One of the main drawbacks of lightweight structure is the sound transmission. The main topic is low frequency annoyance, however the complex structural elements and their mutual sensitive connections other acoustical problems might appear.

Industrialiserat byggande

The industrialization of construction is increasing in Sweden which leads to higher demands of prefabricated components and cells. But what does the business of construction think of the industrialized business and what can be done in order to decrease faults and errors with these products? Today we have many manufacturers who have different technical solutions which might lead to difficulties when assembling components and cells at the building site. But by trying to make a more opened market, with possibly standardized connections details and improving the communication between the different participants, the prefabricated components and cells can be made and assembled with less errors. This is something that needs to be done in order to establish a more secure business, and especially when working with new companies and methods, when using industrialized products..

Utvärdering av skalväggar som byggnadsmetod

Granskande av ritningar, tidsplaner och kalkyler för referensprojektet Hus N i Växjö har hjälpt oss kartlägga skalväggars för- och nackdelar. Från intervjuer har vi sedan kunnat se liknelser och skillnader om vad olika yrkesfolk i samma bransch tycker, sedan därifrån dragit slutsatser. Det är inte alltid enkelt att avgöra vilken byggnadsmetod som är att föredra för att projektet ska vara kostnadseffektivt, prefabricerat eller platsbyggd. Faktorer som byggnadens konstruktion, årstid, arbetsmiljö, resurser, tid och kostnad ska ta hänsyns till.Genom att planera bättre, öka förtillverkningen, skapa en bättre samverkan mellan byggherrar, konsulter, entreprenörer, underentreprenörer och materialleverantörer, så anser man allmänt att man kan öka industrialiseringen av byggandet. Då man kan få kortare byggtider och lägre totalkostnader. .

Valmöjligheter i samband med prefabricerade badrum

This report deals with prefabricated bathrooms and the advantage, during the production process, they have compared to ordinary produced bathrooms.The work is done together with the building company JM. The common task is to investigate if the manufactures, in spite of standardized design can meet the concept of JM, i.e. high flexibility and adjustment towards the customer. In JM they are doubtful to the method, as they did not yet worked with prefabricated modules and think that the choises for the costumer will be limited.There will be a short resume of the progress of the bathrooms and its importance as sanitary and wellbeing.The recent problems with damage caused by damp in bathrooms. Have resultade in regulations.

Uttorkningsmöjligheter i ett fuktskadat badrum med hjälp av spaltmetoden

Buildings today are built to maintain a healthy indoor environment and an efficient energy usage which is probably why damages caused by dampness has increased since the 1960?s.A study between year 2008 and 2010 showed that 26 percent of the 110 000 examined houses had damages and flaws caused by dampness that could prove to be harmful later on. This means that one out of four bathrooms risk the chance to develop damages by dampness. Approximately 2 percent of the houses had already developed water damages. It is here where the problems appear.

1 Nästa sida ->